Kaluga Region is one of the most promising regions of Russia to make investments in. The region holds the second place in the national rating of investment attractiveness. For a number of years Kaluga Region has been holding the leading positions in terms of industrial output growth rates.  

95 new production facilities were commissioned in the region 2006 – 2016. Over 25,000 new jobs were created.  7 new major plants were commissioned in Kaluga Region in 2016. Tax breaks and benefits are provided to all investors irrespective of their origin and industry.

Production sites available to investors in 12 industrial parks and Lyudinovo and Borovsk special economic zones have become the main product offered by Kaluga Region to potential investors. Each site has all relevant infrastructure and utilities (power, gas, water, treatment facilities). Lafarge, Nestle, Continental, Fuyao Glass, Samsung, L’Oreal, General Electric, Magna, etc. have implemented their projects in the territory of industrial parks.  

160 projects from around the world are implemented on Kaluga Region soil. 

Rosva Industrial Park

More about park
Peugeot Citroёn Mitsubishi Automobiles Rus ООО
Country: France
Project: Construction of a car manufacturing plant
Date: 29.01.2008
Land area (m2): 1450000
Start of construction: April, 2009
Commissioning: April 23, 2010
Start of production, the opening of business on (date): 23.04.2010
GE Rus OOO
Country: USA
Project: Construction of an electric power plant repair facility
Date: 18.03.2009
Land area (m2): 52504
Start of construction: August, 2009
Commissioning: November, 2010
Start of production, the opening of business on (date): 08.11.2010
Fuchs Oil OOO
Country: Germany
Project: Construction of a plant to produce lubricants and associated materials of Fuchs Group
Date: 27.06.2011
Land area (m2): 50675
Start of construction: November, 2011
Commissioning: September 19, 2013
Continental Kaluga ООО
Country: Germany
Project: Construction of a tire plant
Date: 18.01.2038
Land area (m2): 600000
Start of construction: December, 2011
Commissioning: 29 October, 2013
ContiTech
year of the start of the project investor: 2013
Country: Germany
Project: Piping for air conditioning systems and components for power steering
Land area (m2): 4800
Start of construction: February, 2013
Commissioning: III quarter of 2014
Rosva Biotechnology Complex ZAO
year of the start of the project investor: 2012
Country: Russia (Kaluga)
Project: A facility for wheat deep processing
Date: 23.07.2012
Land area (m2): 182686
Start of construction: June, 2012
Commissioning: 2015
Start of production, the opening of business on (date): 23.06.2015
Faurecia Automotive Development ООО
Country: France
Project: Construction of interior components manufacturing plant
Date: 20.12.2011
Land area (m2): 28
Start of construction: July, 2011
Commissioning: August, 2012
Start of production, the opening of business on (date): 07.01.2013
Faurecia Automotive Development ООО
Country: France
Project: Construction of a plant to produce exhaust systems for petrol engines
Date: 20.12.2011
Land area (m2): 13926
Start of construction: December, 2011
Commissioning: August, 2012
Start of production, the opening of business on (date): 07.01.2013
ST Pharm ООО
year of the start of the project investor: 2013
Country: Russia
Project: Construction of a production and storage facility for the development and production of modern cardiovascular drugs
Date: 09.08.2013
Land area (m2): 40047
Project Status: underway
Start of construction: October, 2013
Commissioning: 2017
Sibirsky Element - Rena - K ООО
year of the start of the project investor: 2013
Country: Russia (Krasnoyarsk(?) Kaluga)
Project: Construction of a plant to produce constructional materials
Land area (m2): 733400
Project Status: underway
Start of construction: 2013
Commissioning: 2016
BaziS ZAO (Tascom ZAO (Bazis ООО - Magistral)
Country: Moscow
Project: Customs & Logistics Center "Rosva"
Date: 09.04.2009
Land area (m2): 627889
Start of construction: 2010
Commissioning: 2012

Kaluga-Yug Industrial Park

More about park
Volvo Vostok ZAO
year of the start of the project investor: 2007
Country: Sweden/Russia (Khimki)
Project: Construction of a commercial truck assembly plant
Date: 04.07.2007
Land area (m2): 553373
Start of construction: June, 2007
Commissioning: January, 2009
Volvo Vostok ZAO
year of the start of the project investor: 2012
Country: Sweden/Russia (Khimki)
Project: Construction of a construction equipment plant (excavators)
Date: 27.07.2012
Land area (m2): 553373
Start of construction: April, 2012
Commissioning: May, 2013
Volvo Vostok OOO
year of the start of the project investor: 2013
Country: Sweden
Project: construction of a Volvo cabs manufacturing plant
Land area (m2): 553373
Start of construction: June, 2013
Commissioning: IV quarter of 2014
Betsema-Kaluga ZAO
Country: Russia (Krasnogorsk)
Project: Construction of a plant to produce detachable equipment for trucks
Date: 27.12.2007
Land area (m2): 68500
Project Status: pause
Mako Furnitura OOO
Country: Austria
Project: Construction of a plant to produce window hardware
Date: 31.10.2006
Land area (m2): 53010
Start of construction: October, 2007
Commissioning: May 27, 2010
Continental Automotive Systems Rus ООО
year of the start of the project investor: 2011
Country: Germany/Russia
Project: Construction of an auto component plant (automotive engine controllers)
Date: 29.12.2012
Land area (m2): 50000
Start of construction: November, 2011
Commissioning: 2014
Start of production, the opening of business on (date): 05.06.2014
Recast AO
year of the start of the project investor: 2013
Country: Russia (Kaluga)
Project: Construction of a plant to produce packing and container materials based on paper honeycomb core fillers
Date: 29.04.2013
Land area (m2): 14725
Start of construction: III quarter of 2013
Commissioning: IV quarter of 2015
Merkator Kaluga ООО
Country: Russia
Project: Construction of a plant to produce detachable equipment for various types of chassis and assemble it
Land area (m2): 73400
Start of construction: 2011
Commissioning: May, 2014
EkoAlyans ZAO
year of the start of the project investor: 2013
Country: Russia
Project: creation and development of the park of small and medium business in the Kaluga region
Project Status: underway
"MMD Group of companies" East and West" AO (Bosco)
Country: Russia
Project: construction of garment factory
Date: 26.12.2016
Project Status: underway

Grabtsevo Industrial Park

More about park
Volkswagen Group Rus OOO
year of the start of the project investor: 2006
Country: Germany
Project: Construction of a car manufacturing plant
Land area (m2): 2149824
Start of construction: October, 2006
Commissioning: November 28, 2007
Start of production, the opening of business on (date): 28.11.2007
Volkswagen Group Rus OOO
year of the start of the project investor: 2012
Country: Germany
Project: Construction of a car engine plant
Date: 28.08.2012
Land area (m2): 2149824
Start of construction: August, 2012
Commissioning: 2015
Start of production, the opening of business on (date): 04.01.1970
Gestamp Severstal Kaluga OOO
Country: Russia/Spain
Project: Construction of plant to produce car body forged components
Date: 12.08.2010
Land area (m2): 2149824
Start of construction: May, 2009
Commissioning: September, 2010
Start of production, the opening of business on (date): 13.07.2010
Severstal Gonvarry Kaluga OOO
Country: Russia-Spain
Project: Construction of a metallurgy service center
Date: 24.08.2010
Land area (m2): 2149824
Start of construction: May, 2009
Commissioning: July, 2010
Start of production, the opening of business on (date): 13.07.2010
Severstal Gonvarry Kaluga OOO
Country: Russia-Spain
Project: Construction of a production unit No 2 of a metallurgy center for forged components manufacturing
Date: 29.12.2012
Land area (m2): 2149824
Start of construction: 2013
Commissioning: December, 2013
Magna Automotiv Rus AO
Country: Canada-Austria
Project: Construction of a plant to manufacture auto components (front modules, bumpers)
Date: 18.03.2009
Land area (m2): 70000
Start of construction: May, 2009
Commissioning: October 28, 2010
Start of production, the opening of business on (date): 28.10.2010
YAPP Rus Automotive Systems OOO
Country: China
Project: Construction of a plant to manufacture vehicle plastic fuel tanks
Date: 27.10.2009
Land area (m2): 20000
Start of construction: November, 2009
Commissioning: June 6, 2011
Start of production, the opening of business on (date): 06.07.2011
Benteler Automotive OOO
Country: Germany
Project: Construction of an auto component plant (assembly components, exhaust systems, engine parts, engineering)
Date: 17.06.2010
Land area (m2): 209928
Start of construction: III quarter of 2009
Commissioning: June, 2010
Reydel Automotive Rus (Visteon Rus OOO)
year of the start of the project investor: 2009
Country: USA
Project: Construction of a plant to manufacture vehicle interior trim
Land area (m2): 209928
Start of construction: III quarter of 2009
Commissioning: September 10, 2010
Novo Nordisk Production Support OOO
year of the start of the project investor: 2010
Country: Denmark
Project: Construction of a factory to produce insulin
Date: 08.07.2010
Land area (m2): 50000
Start of construction: September, 2011
Commissioning: 2015
Start of production, the opening of business on (date): 10.04.2015
Berlin Pharma ZAO
year of the start of the project investor: 2010
Country: Italy
Project: Construction of a plant for the development, production and marketing of pharmaceutical products
Date: 19.03.2010
Land area (m2): 50000
Start of construction: August, 2010
Commissioning: 2014
Start of production, the opening of business on (date): 19.05.2014
Berlin Pharma ZAO
year of the start of the project investor: 2010
Country: Italy
Project: Construction of a pharmaceutical plant (additional site)
Date: 04.02.2015
Fuyao Steklo Rus ООО
Country: China
Project: Construction of a plant to produce automotive glass
Date: 16.06.2011
Land area (m2): 129986
Start of construction: August, 2011
Commissioning: September, 2013
Start of production, the opening of business on (date): 07.03.2014
Industrial Steel Recycling ООО (SC Gescrap)
Country: USA (?)
Project: Processing of metal waste
Commissioning: June, 2011
Start of production, the opening of business on (date): 07.06.2011
International airport «Kaluga»
year of the start of the project investor: 2013
Country: Russia
Project: Creation of a modern international airport in the Kaluga region
Experimental Design Bureau of Microelectronics AO
year of the start of the project investor: 2016
Country: Russia
Project: The construction of clean rooms to accommodate a high-tech line of growing crystals of integrated microcircuits
Date: 01.03.2016
Project Status: underway

Vorsino Industrial Park

More about park
Samsung Electronics Rus Kaluga ООО
Country: Korea
Project: Construction of a home appliances plant
Date: 09.06.2007
Land area (m2): 472479
Start of construction: September, 2007
Commissioning: July, 2008
Start of production, the opening of business on (date): 31.12.2009
Odisseyprom ООО
Country: Russia
Project: Construction of a plant to manufacture kitchen units components
Land area (m2): 260000
Start of construction: April, 2009
Commissioning: November, 2010
Vintrustcom ZAO
Country: Russia
Project: Construction of a plastick packing plant
Date: 17.05.2007
Land area (m2): 190410
Start of construction: June, 2012
Commissioning: March, 2011
Nestle Russia OOO
year of the start of the project investor: 2010
Country: Switzerland
Project: Construction of a pet food plant
Land area (m2): 209000
Start of construction: 2006
Commissioning: August 28, 2007
LOreal ZAO
Country: France-Russia
Project: Construction of a cosmetics plant
Date: 23.06.2008
Land area (m2): 149995
Start of construction: 2010
Commissioning: September 23, 2010
Start of production, the opening of business on (date): 24.06.2011
KT&G Rus OOO
Country: Korea
Project: Construction of a tobacco factory
Date: 24.11.2008
Land area (m2): 103421
Start of construction: February, 2010
Commissioning: October 8, 2010
NLMK Kaluga ООО
Country: Russia
Project: Construction of a metallurgical plant
Date: 22.12.2010
Land area (m2): 2120000
Start of construction: 2010
Commissioning: July 23, 2013
Metallist Production Company ООО
year of the start of the project investor: 2011
Country: Russia
Project: Construction of a production facility to manufacture metal sheet water drainage systems for low-rise buildings as well as fencing of metal rods and metal sheets
Date: 26.07.2011
Land area (m2): 120000
Start of construction: January, 2011
Commissioning: June, 2012
Omega Lease Kaluga ООО
year of the start of the project investor: 2007
Country: Turkey
Project: Construction of a logistics center, a concrete plant and construction materials warehouse
Date: 17.05.2007
Land area (m2): 193543
Start of construction: June, 2012
Commissioning: December, 2012
Omega Lease Kaluga ООО
year of the start of the project investor: 2013
Country: Turkey
Project: Construction of a production and logistics center (2 stage)
Date: 10.07.2013
Land area (m2): 167974
Start of construction: III quarter of 2013
Commissioning: 2015
Start of production, the opening of business on (date): 01.03.2015
Omega Lease Kaluga ООО
year of the start of the project investor: 2015
Country: Turkey
Project: construction of production and logistics center (Stage 3)
Date: 09.02.2015
Land area (m2): 167974
Project Status: underway
Start of construction: 2015
Commissioning: 2017
Triada Impex ZAO
Country: Russia
Project: Construction of a production facility to manufacture specialized compositions for repair, restoration, water insulation and grouting using polymeric and concrete materials
Date: 24.08.2010
Land area (m2): 25000
Project Status: underway
Start of construction: May, 2012
Commissioning: III quarter of 2014
AstraZeneca Industries ООО
year of the start of the project investor: 2011
Country: Англия/Sweden
Project: Construction of a pharmaceutical plant to manufacture finished dosage forms and a pharmaceutical warehouse
Date: 25.10.2012
Land area (m2): 61400
Start of construction: December, 2011
Commissioning: 2015
Start of production, the opening of business on (date): 20.10.2015
AstraZeneca Industries ООО
year of the start of the project investor: 2015
Country: Англия
Project: Construction of a pharmaceutical plant to manufacture finished dosage forms and a pharmaceutical warehouse
Date: 08.06.2015
Project Status: underway
Start of construction: 2015
Commissioning: 2018
Stroitelnyi Mir OOO
year of the start of the project investor: 2012
Country: Russia
Project: Construction of a production and warehousing facility for construction materials and tools
Date: 02.11.2012
Land area (m2): 59948
Start of construction: June, 2012
Commissioning: March, 2014
Freight Village Ru ОOО (Freight Village Kaluga Sever ООО)
year of the start of the project investor: 2011
Country: Russia
Project: Establishment of a multimodal logistics terminal
Date: 06.06.2011
Land area (m2): 4050000
Start of construction: July, 2012
Commissioning: November, 2013
SPHERA FARM OOO
year of the start of the project investor: 2012
Country: Russia
Project: manufacturing of medical intravenous solutions
Date: 05.06.2012
Land area (m2): 30000
Start of construction: May, 2012
Commissioning: I quarter of 2015
MAHLE RUS OOO
year of the start of the project investor: 2012
Country: Gernamy
Project: production and warehouse complex for automobile components
Date: 06.06.2012
Land area (m2): 50000
Start of construction: 2012
Commissioning: III quarter of 2014
LAMINAM RUS OOO
year of the start of the project investor: 2012
Country: Italy
Project: manufacturing of extra-fine ceramic tile
Date: 25.10.2012
Land area (m2): 50000
Start of construction: 2012
Commissioning: 2015
Omia Ural OOO
year of the start of the project investor: 2012
Country: Switzerland
Project: Construction of a crushed marble factory
Date: 24.09.2012
Land area (m2): 150000
Start of construction: 2012
Commissioning: I quarter of 2014
ICM Glass Kaluga ООО
year of the start of the project investor: 2012
Country: Russia
Project: Construction of a plant to produce construction materials
Date: 29.12.2012
Land area (m2): 40000
Start of construction: 2012
Commissioning: IV quarter of 2013
Arkhbum Tissya groups OOO
Country: Russia
Project: Construction of a tissue paper plant with processing facilities
Date: 01.04.2013
Land area (m2): 120000
Project Status: underway
Start of construction: 2013
Commissioning: 2016
М-3 Logistic OOO
year of the start of the project investor: 2012
Country: Russia
Project: Construction of a multimodal transport logistics terminal
Land area (m2): 1054336
Start of construction: July, 2012
Galen OOO
year of the start of the project investor: 2015
Country: Russia
Project: Production of energy-efficient window profiles of fiberglass composite materials
Start of construction: 2016
Commissioning: 2017
Techmachimpex ZAO
year of the start of the project investor: 2014
Country: Russia
Project: Construction of the plant for the production of plastic products
Date: 23.07.2014
Project Status: underway
Start of construction: 2014
Commissioning: 2016
Linde Gaz Rus OAO
year of the start of the project investor: 2011
Country: Sweden-Germany
Project: Construction of an air separation plant
Date: 10.05.2011
Commissioning: September 4, 2013
Airlife OOO
year of the start of the project investor: 2013
Project: Construction of a plant for the production of photocatalytic air purifiers
Date: 24.10.2013
Project Status: underway
Commissioning: 2015
DA RUS OOO
year of the start of the project investor: 2015
Country: Korea
Project: construction of plant for the production of rubber and plastic products
Land area (m2): 60000
Project Status: underway
Commissioning: 2018
Novamedica OOO
year of the start of the project investor: 2013
Country: USA
Project: construction of a pharmaceutical plant for production of solid dosage forms in tablets and gelatin capsules
Land area (m2): 50009
Project Status: underway
Start of construction: 2013
Commissioning: 2019
Steelpaint-Ru Varnish-and-paint products OOO
year of the start of the project investor: 2016
Country: Germany
Project: The construction of a plant for the production of paints and varnishes
Date: 28.07.2016
Project Status: underway
Total-Vostok OOO
year of the start of the project investor: 2016
Country: France
Project: Construction of a plant for the production, storage and shipment of motor oils for internal combustion engines, lubricants and other industrial applications, as well as related materials
Date: 17.10.2016
Project Status: underway
ORAC OOO
year of the start of the project investor: 2017
Country: Belgium
Project: Placement of production of innovative decorative synthetic moldings and ornaments
Date: 14.12.2016
Project Status: underway

Tenants B-Park (Kaluga-Yug Elikor)

Scherdel Kaluga ООО
Country: Germany/Russia
Project: Production of car seats frames
Commissioning: 2010
HP Pelzer Rus OOO
Country: Germany/Russia
Project: Construction of a plant to produce car noise insulation
Commissioning: 2010
Toyota Tsusho Rus ООО
year of the start of the project investor: 2013
Country: Japan/Russia (St. Petersburg)
Project: Organization of logistics processes
Project Status: underway

Obninsk Industrial Park

More about park
Lotte Confectionery Rus Kaluga OOO
Country: Korea
Project: Construction of a confectionery factory
Date: 18.12.2008
Land area (m2): 133804
Start of construction: 2009
Commissioning: September, 2010
Start of production, the opening of business on (date): 18.12.2013
Niarmedik Pharma ООО
year of the start of the project investor: 2010
Country: Russia
Project: Construction of a pharmaceutical plant for "Kagocel" medical product manufacturing, innovative substances synthesis, collagen processing
Date: 14.09.2010
Land area (m2): 50000
Start of construction: 2012
Commissioning: 2015
Start of production, the opening of business on (date): 04.06.2015
Palladio Obninsk OOO (Palladio Zannini Industri Grafiche Cartotecniche SpA)
Country: Italy
Project: Construction of a plant for manufacturing of packaging for pharmaceuticals and cosmetics
Date: 28.11.2013
Start of construction: 2013
Commissioning: December, 2015
Technologiya pitaniya OOO
year of the start of the project investor: 2016
Country: Russia
Project: Construction of a brewery in the Kaluga region
Date: 14.11.2016
Project Status: underway

Obninsk

RADICO Scientific and Production Company OOO
Country: Russia
Project: Construction of a manufacturing complex to produce components, equipment and integrated system solutions
Date: 08.07.2011
Land area (m2): 12000
Start of construction: 2011
Commissioning: 2016
Kaluga Sales Company ОАО
Country: Russia
Project: Construction of Obninsk GTP - CHPP No 1
Date: 01.12.2011
Commissioning: October, 2013
LTM ООО
Country: Finland
Project: Construction of a plant to produce wall cladding panels
Date: 21.09.2006
Commissioning: 2009
Hemofarm ООО
Country: Serbia
Project: Construction of a plant to produce finished pharma products
Date: 04.05.2002
Land area (m2): 100000
Start of construction: 2005
Commissioning: IV quarter of 2007
Ruukki Rus ООО
Country: Finland
Project: Production of construction metal structures
Commissioning: 2010
Craftway Corporation PLC ZAO
Country: Russia
Project: Production of personal computers, servers, management of quality assurance
Land area (m2): 60000
Commissioning: 2007
Sanatmetal SNG OOO
year of the start of the project investor: 2016
Project: Construction of the plant for the production of implants and instruments for traumatology and orthopedics
Date: 03.03.2016
Project Status: underway

Lemminkainen Industrial Park

More about park
Lemminkainen Stroy ООО
year of the start of the project investor: 2015
Country: Finland
Project: Industrial park creation and development
Date: 15.11.2007
Land area (m2): 5550000
Project Status: underway
Start of construction: 2015
Rani Plast Kaluga OOO
year of the start of the project investor: 2010
Country: Finland
Project: Construction of a stretch film production facility
Date: 29.06.2010
Land area (m2): 22960
Start of construction: 2011
Commissioning: September, 2012

Kollontay Industrial Park

More about park
Kiilto Kaluga OOO
Country: Finland
Project: organization of dry mortar mix and industrial glue production
Date: 27.03.2007
Land area (m2): 40000
Start of construction: 2007
Commissioning: June, 2010
Start of production, the opening of business on (date): 05.08.2010

Maklaki Industrial Park

More about park
Kaluga Concrete Plant OOO ("Master" Association)
Country: Russia
Project: Construction of a concrete plant
Date: 16.02.2010
Land area (m2): 1
Project Status: underway
Start of construction: February, 2010
Commissioning: IV quarter of 2014

Detchino Industrial Park

Grimme Kaluga OOO
Country: Germany
Project: Construction of an agricultural equipment distribution and maintenance center
Date: 27.09.2007
Land area (m2): 82006
Start of construction: September, 2008
Commissioning: May, 2010
Lemken Kaluga OOO
Country: Germany
Project: Construction of an agricultural equipment distribution and maintenance center
Date: 27.09.2007
Land area (m2): 81254
Start of construction: September, 2008
Commissioning: May, 2010
Agro Invest OOO (Big Dutchman)
Country: Germany
Project: Construction of an animal breeding equipment distribution and maintenance center
Date: 22.10.2008
Land area (m2): 81749
Start of construction: March, 2010
Commissioning: December, 2010
Wolf System OOO
Country: Austria
Project: Construction of a plant to manufacture structures for agricultural facilities and wooden frame-panel buildings
Date: 27.09.2007
Land area (m2): 81412
Project Status: underway
Start of construction: June, 2010
Commissioning: 22 quarter of 2014
EkoNiva Kaluga OOO
Country: Russia
Project: Construction of service center for warranty service of agricultural equipment
Date: 27.09.2007
Land area (m2): 42928
Start of construction: May, 2010
Commissioning: July, 2013
Industrial Construction Company OOO
Country: Russia
Project: Construction of a brick factory
Date: 17.05.2007
Land area (m2): 131100
Project Status: pause
Russian product PAO
year of the start of the project investor: 2013
Country: Russia
Project: Food production: soups, flour baking mixes, breading mixes, culinary additives, porridges, extruded corn chips
Date: 16.10.2013

Meshchovsk Industrial Park

Meshchovsk Combine Transport Casting OOO
year of the start of the project investor: 2014
Country: Russia
Project: Construction of the plant for the production of car casting
Date: 14.04.2014
Project Status: underway
Start of construction: 2014
Commissioning: 2017

Special Economic Zone

Agro-Invest OOO
year of the start of the project investor: 2014
Country: Russia
Project: Creation of innovative agricultural production
Date: 25.03.2014
Project Status: underway
Start of construction: 2014
Commissioning: 2017
VODOSTOP OOO
Country: Russia
Project: Construction of a plant for the production of parquet from ultralight composite
Project Status: underway
Start of construction: 2016
Commissioning: 2017
EcoDSK Lyudinovo
Country: Russia
Project: Creating the first Russian resource-house-building plant on the basis of deep wood processing technology using low-grade and softwood trees
Project Status: underway
Start of construction: 2016
Commissioning: 2017
Krasin Pencil Factory OOO
Country: Russia
Project: Construction of the plant for school supplies production
Project Status: underway
Start of construction: 2016
Commissioning: 2017
Alhimet OOO
year of the start of the project investor: 2016
Country: Russia
Project: Construction of innovative hardware products factory
Date: 03.02.2016
Project Status: underway
San Marco Russiya OOO
year of the start of the project investor: 2016
Project: Construction of a factory for production of paint and varnish materials
Project Status: underway
Start of construction: 2016
Interfarmglass Kaluga OOO
year of the start of the project investor: 2016
Country: Russia
Project: The construction of a plant for the production of neutral borosilicate glass for production of glass tubes, ampoules, vials, cartridges for the pharmaceutical industry
Project Status: underway
Kaluga Polimer OOO
year of the start of the project investor: 2016
Country: Russia
Project: Construction of a plant for the production of pump dispensers for the cosmetic industry, the packaging of liquid detergents
Project Status: underway
DEСO GROUP OOO
year of the start of the project investor: 2016
Country: Russia
Project: The construction of a plant for the production of Wallpaper on non-woven production with capacity of 2 102.4 thousand rolls a year
Project Status: underway
Kronospan Kaluga OOO
year of the start of the project investor: 2016
Country: Austria
Project: Placement of the enterprise for the production of fibreboard
Project Status: underway
Refcool OOO
year of the start of the project investor: 2017
Project: Сomplex for production of climate control and refrigerating equipment
Project Status: underway
Innovatsionnye Kompositnye Technologiy OOO
year of the start of the project investor: 2017
Project: Plant for production of composite materials for construction and industries.
Project Status: underway

Investment projects outside the industrial parks

Lear ООО
year of the start of the project investor: 2009
Country: Luxembourg/USA
Project: Production of car seats
Commissioning: 2009
Gervasi Vostok OOO
year of the start of the project investor: 2013
Country: Italy
Project: Truck body manufacturing
Commissioning: November 28, 2013
Zavod MPK OOO (CIE AVTOCOM Kaluga ООО)
year of the start of the project investor: 2010
Country: Spain /Russia
Project: Production of automotive components
Commissioning: 2010
HT & L Fitting Rus ООО
Country: Italy
Project: wheel assembly
Commissioning: 2011
Bosal ООО
year of the start of the project investor: 2006
Country: Belgium/Netherlands
Project: Production of automotive exhaust systems
Commissioning: 2009
AD Plastik Kaluga ZAO
year of the start of the project investor: 2012
Country: Croatia
Project: Acquisition and renovation of a production and warehouse facility for the production of automotive components and parts
Date: 29.12.2012
Project Status: underway
Gervasi East OOO
year of the start of the project investor: 2013
Country: Italy
Project: Truck body manufacturing plant in Kaluga
Date: 07.06.2013
Commissioning: 2013
SMK OOO
year of the start of the project investor: 2014
Country: Italy
Project: Enterprise for production of fuel tanks for trucks
Date: 11.04.2014
Project Status: underway
Start of construction: 2014
Commissioning: 2015
Agro Tech OOO
year of the start of the project investor: 2014
Country: Russia
Project: Creating a greenhouse complex to grow vegetables using of the most advanced foreign production technologies
Project Status: underway
Start of construction: 2014
Commissioning: 2016
Karelia Upofloor CIS OOO
Country: Russia-Romania (since 2012 together with a Swedish company)
Project: Construction of a parquet board factory
Date: 10.05.2011
Land area (m2): 44360
Start of construction: March, 2008
Commissioning: October, 2009
Veles Kapital IG OOO
Country: Russia
Project: Industrial park creation and development
Date: 09.12.2010
Land area (m2): 1109712
Project Status: underway
Start of construction: III quarter of 2013
Commissioning: 2015
Agrisovgaz OOO
year of the start of the project investor: 2011
Country: Russia
Project: Construction of hot dip galvanizing plant
Date: 19.09.2011
Land area (m2): 40000
Commissioning: 2012
Agroinvest OOO
Country: Russia
Project: Construction of greenhouses for farming
Date: 19.09.2011
Land area (m2): 1800000
Project Status: underway
Spektr OOO
Country: Russia
Project: Construction of a logistics center to receive, store and distribute electrical products
Date: 24.06.2010
Land area (m2): 49000
Start of construction: 2014
Commissioning: 2016
Zuegg Russia ООО
Country: Italy
Project: Fruit processing facility
Commissioning: 2011
DSK Gras Kaluga ООО
Country: Russia
Project: Gas-concrete blocks manufacturing
Commissioning: 2009
Tyretsky Solerudnik OAO
year of the start of the project investor: 2013
Country: Russia
Project: Construction of a salt factory
Project Status: underway
Start of construction: 2013
Sony DADC OOO
Country: Japan
Project: Establishment of a production facility to manufacture optical disks
Date: 05.07.2011
Land area (m2): 42300
Start of construction: June, 2009
Commissioning: October, 2011
Porcher Sovremenniye Materialy ООО
year of the start of the project investor: 2012
Country: France
Project: Establishment of industrial textile production facility
Date: 07.02.2012
Land area (m2): 2994
Start of construction: February, 2012
Commissioning: 2012
Freelite ZAO
Country: Russia
Project: Creation of an industrial complex to manufacture stoneware tiles with capacity of 9 million square meters per year
Date: 13.02.2013
Land area (m2): 73935
Project Status: underway
Start of construction: 2013
Commissioning: III quarter of 2014
Stora Enso Packaging BB OOO
Country: Finland
Project: Acquisition of a production line to manufacture corrugated fiberboard packaging
Date: 02.09.2011
Land area (m2): 89000
Commissioning: November 07, 2011
AGC Aluminum Extrusion Manufacturer ООО
Country: Russia
Project: Aluminum extrusion manufacture
Commissioning: 2007
Simon Holding Investments ООО
Country: Russia
Project: Manufacture of electrical products
Commissioning: 2008
Polar Seafood Russia OOO
year of the start of the project investor: 2012
Country: Denmark
Project: Construction of a production and warehousing facility to process and store fish and sea food
Date: 24.09.2012
Land area (m2): 26000
Start of construction: March, 2013
Commissioning: III quarter of 2013
Metallobaza OOO
year of the start of the project investor: 2012
Country: Russia
Project: Construction of a metal production facility "Servisniy Metallocenter"
Date: 01.10.2012
Land area (m2): 30000
Project Status: underway
Start of construction: 2013
Commissioning: 2015
Pipelife Rus ООО
Country: Austria
Project: Production of polyethylene pipes
Commissioning: 2007
Arkhpolis Center for Support of Architects, Designers, Painters and Performers (ANO)
year of the start of the project investor: 2012
Country: Russia
Project: Creation and development of a tourism and recreation cluster "Nikola-Lenivets"
Date: 21.11.2012
Land area (m2): 5440848
Project Status: underway
Commissioning: IV quarter of 2018
Fels Izvest ООО (GC "Terex")
Country: Russia-Germany
Project: Construction of a plant to manufacture lime
Date: 22.12.2010
Land area (m2): 38382
Start of construction: October, 2007
Commissioning: May, 2009
Terex Group of Companies ООО - «Klinker - 47» plant
Country: Russia
Project: Construction bricks manufacture
Commissioning: 2010
Forbo Kaluga ООО
Country: Switzerland
Project: Production of flooring
Commissioning: November 11, 2008
Start of production, the opening of business on (date): 01.01.2009
Transstrominvest ООО
Country: Russia
Commissioning: 2006
Agro Product OOO
year of the start of the project investor: 2016
Country: Russia
Project: Construction of a greenhouse complex "Starkey" for year-round production of vegetable products in closed ground
Date: 14.09.2016
Project Status: underway
Lafarge Tsement OAO
Country: France
Project: Construction of a concrete plant
Date: 31.07.2009
Land area (m2): 2667000
Project Status: underway
Start of construction: July, 2011
Commissioning: May, 2014
OGOR’ Industrial Park OOO
year of the start of the project investor: 2013
Country: Russia
Project: OGOR’ Industrial Park
Project Status: underway
Start of construction: 2013
Commissioning: 2016
PolyPark OOO
year of the start of the project investor: 2013
Country: Russia
Project: Construction of a confectionery factory for manufacturing of cream and sponge cake products
Project Status: underway
Lyudinovokabel ZAO
Country: Russia
Project: Acquisition and reconstruction of a production facility to manufacture self-supporting insulated cables, revamping and expansion of the existing cable production facility
Land area (m2): 14210
Commissioning: March, 2011
AIS Automotive Interior Systems GmbH
year of the start of the project investor: 2013
Country: Germany
Project: Company for the production of automotive components (injection molding).
Date: 16.08.2013
Start of construction: 2014
Postak ООО
Country: Finland
Project: Envelopes of BONG AB production
Commissioning: 2006
VMK INVEST ООО
Country: Russia
Project: Aluminum extrusion manufacture
Commissioning: 2010
Bryansk Meat Company OOO
year of the start of the project investor: 2015
Country: Russia
Project: Increase the capacity of the complex for the production of highly beef cattle population
Project Status: underway
Start of construction: 2015
Commissioning: 2017
GRAN LETYE OOO
year of the start of the project investor: 2017
Country: France
Project: The construction of an agro-industrial park for the production of traditional French cheeses
Project Status: underway